Seven Bridges

The Seven Bridges consist of Petang, Malitlit, San Isidro, San Cristobal, Majada, Canlubang, and Mayapa bridges. All are located along the stretch of the SLEX between Sta. Rosa Exit and the Calamba Interchange. Each bridge was rehabilitated and widened. Except Mayapa Bridge Southbound, all bridges were widened from two lanes to three lanes each bound. Mayapa Southbound was widened from three lanes to four lanes.

 
Canlubang Bridge Majada Bridge
   
Malitlit Bridge Mayapa Bridge
   
Petang Bridge San Cristobal Bridge
 
San Isidro Bridge
   

 


APPLIED TECHNOLOGIES


Bored Piling

 

 


Girder Launching

 

 

Anchoring

 

 

Controlled Demolition